BAYBUL (01/03/08 1932)
SFORVFRN
ISSUED: THU JAN 3 2008 734 PM PST
NEXT: FRI JAN 4 2008 800 AM PST
BULLETIN
RUSSIAN/NAPA RIVER FORECAST
CALIFORNIA NEVADA RIVER FORECAST CENTER, NATIONAL WEATHER SERVICE
AND THE CALIFORNIA DEPARTMENT OF WATER RESOURCES, SACRAMENTO, CA
ATTENTION...THE FOLLOWING STAGES OF PARTICULAR SIGNIFICANCE
HAVE OCCURRED OR ARE EXPECTED TO OCCUR
FLOOD STAGE
NAVARRO RIVER AT NAVARRO
MONITOR STAGE
RUSSIAN RIVER AT HOPLAND
INTENSE RAINFALL IS FORECAST FOR THE NEXT 24 HOURS. THE NAVARRO
RIVER IS EXPECTED TO EXCEED FLOOD STAGE FRIDAY NEAR NOON. THE
RUSSIAN RIVER IS ALSO EXPECTING SIGNIFICANT RISES REQUIRING
MONITORING.
FORECASTS ARE BASED ON PRESENT AND FORECASTED METEOROLOGICAL
AND HYDROLOGIC CONDITIONS AT TIME OF ISSUANCE.
RUSSIAN RIVER AT
HOPLAND 6 PM STAGE 2.7 FT
FORECAST TO RISE ABOVE MONITOR STAGE FRIDAY AFTERNOON
THEN FORECAST TO CREST NEAR 18.5 FT FRIDAY AFTERNOON
MONITOR STAGE 18.0 FT, FLOOD STAGE 21.0 FT
HEALDSBURG 7 PM STAGE 2.6 FT
FORECAST TO RISE TO NEAR 15.5 FT FRIDAY AFTERNOON
WITH CONTINUED RISE EXPECTED
MONITOR STAGE 20.0 FT, FLOOD STAGE 23.0 FT
GUERNEVILLE BRIDGE 6 PM STAGE 5.6 FT
FORECAST TO RISE TO NEAR 21.0 FT FRIDAY AFTERNOON
WITH CONTINUED RISE EXPECTED
MONITOR STAGE 29.0 FT, FLOOD STAGE 32.0 FT
NAVARRO RIVER AT
NAVARRO 6 PM STAGE 3.7 FT
FORECAST TO RISE ABOVE FLOOD STAGE FRIDAY AFTERNOON
THEN FORECAST TO RISE TO NEAR 24.0 FT FRIDAY EVENING
WITH CONTINUED RISE EXPECTED
FLOOD STAGE 23.0 FT
UNLISTED FORECAST POINTS ARE EXPECTED TO REMAIN BELOW MONITOR STAGE.
ALL THOSE AFFECTED BY RIVER CONDITIONS SHOULD REMAIN ALERT FOR
RAPID CHANGES AND FOR POSSIBLE FORECAST REVISIONS.
mla
.AR HOPC1 20080103 P DH18/DC200801031934/HG 2.7 :OBSERVED
.ER HOPC1 20080103 P DH20/DC200801031934/HGIFEZZ/DIH03/ 5.0/ 7.2/ 9.5/ 11.7/
.ER1 14.0/ 16.2/ 18.5
.AR HEAC1 20080103 P DH19/DC200801031934/HG 2.6 :OBSERVED
.ER HEAC1 20080103 P DH20/DC200801031934/HGIFEZZ/DIH03/ 4.4/ 6.3/ 8.1/ 10.0/
.ER1 11.8/ 13.7/ 15.5
.ER HEAC1 20080104 P DH16/DC200801031934/HIIFEZZ/DIH03/1 :CONT RISE EXPECTED
.AR GUEC1 20080103 P DH18/DC200801031934/HG 5.6 :OBSERVED
.ER GUEC1 20080103 P DH20/DC200801031934/HGIFEZZ/DIH03/ 7.8/ 10.0/ 12.2/ 14.4/
.ER1 16.6/ 18.8/ 21.0
.ER GUEC1 20080104 P DH16/DC200801031934/HIIFEZZ/DIH03/1 :CONT RISE EXPECTED
.AR NVRC1 20080103 P DH18/DC200801031934/HG 3.7 :OBSERVED
.ER NVRC1 20080103 P DH20/DC200801031934/HGIFEZZ/DIH03/ 6.5/ 9.2/ 12.0/ 14.7/
.ER1 17.5/ 20.2/ 23.0/ 24.0
.ER NVRC1 20080104 P DH19/DC200801031934/HIIFEZZ/DIH03/5 :CONT RISE EXPECTED
NNNN
BAYBUL.0012008